Everything You Need to Know About Remodeling Your Bathroom

Everything You Need to Know About Remodeling Your Bathroom

The length of a bathroom redesign depends on how much work needs to be done. If all you’re replacing the sink and toilet, you might be done in a single day. But, the process could take many days or even weeks if you want to replace the shower’s tiles, tear up the flooring, and move the toilet. The remodelling procedure may also take longer if there are supply chain interruptions and shipment delays.

Below we have highlighted the steps that must be part of any bathroom remodelling program.

1. Find the level of bathroom model

First, think about the broad picture: What kind and scale of bathroom renovation are you envisioning? This is the one that you should have decided upon before beginning any other bathroom planning.

Four fundamental categories can be used to categorize bathroom remodels: surface remodel, more comprehensive gut and replace remodel, or plan modification. The bathroom is completely remodeled on the fourth level. It’s possible that the new bathroom is not even in the old area.

2. Surface-level Remodel

The goal of any surface-level bathroom remodeler is to minimize replacement and maximize cover-up or repair. As a result, compared to other bathroom renovation levels, a surface-level makeover generates less trash and is more environmentally friendly. Because covering and repair materials are less expensive than replacement materials, covering and repairing also results in a considerably less expensive bathroom renovation.

3. Gut and Replace

When you rebuild your bathroom to this extent, the layout and fixture placements remain the same, but the walls and floors are completely removed. The flooring, lighting, vanity, and plumbing fixtures are then installed.

4. Layout Upgrade

This level may require shifting fixtures such as the sink, toilet, and tub/shower, thus it can be considerably more involved than a makeover or even a fixture replacement. It is expensive, nasty, invasive, and labor-intensive to move these things. However, moving these things is frequently required.

Also Read: How Do I Find a Handyman and Hire The Right One?

5. Complete Overhaul

It goes beyond just tearing out the place and rearranging the fixtures to change the bathroom footprint. The biggest bathroom remodels involve significant structural adjustments that affect the perimeter of the space. This can involve changing the ceiling or roof, bashing out an external wall, or shifting or removing walls.

After you decide on the overall strategy, do look at the timetable for the bathroom remodelling project.

6. Prepare a floor plan

Since many of the services are hard to shift, the bathroom’s current layout significantly determines the floor plan. Drainage and water supply are typically grouped together on a single wall.

7. Seek building permits

For information on codes and permissions related to your bathroom makeover, contact your local permitting office. Permitting is typically not required for minor renovations like adding flooring or replacing the sink. Work involving plumbing and electricity usually needs a permit.

8. Demolish the existing structure

All or part of the shower or bathtub, toilet, vanity sink cabinet, flooring, and drywall will probably need to be removed if the bathroom redesign is at least halfway funded.

9. Work on plumbing and electrical systems

Since plumbing and electrical services are at the core of many bathroom problems, a plumber or an electrician will typically need to visit at this stage and pipe or wire the bathroom in accordance with requirements.

10. Install flooring

Bathroom flooring needs to be both aesthetically pleasing and resistant to dampness. Because they are water resistant, luxury vinyl flooring, sheet vinyl, ceramic and porcelain tile, natural stone, and vinyl tile are popular choices for bathroom flooring.

11. Put the toilet

Remodeling Your Bathroom

Above the flooring is where the toilet is situated. If everything is set up correctly, this project can be completed in about an hour.

Install the sink, counter, and cabinet

The installed sink, base cabinets, and bathroom counter are the focal points of activities in the bathroom. It therefore makes sense to take your time and maybe invest a little bit more in this area.

The Conclusion

Looking for a professional support regarding kitchen remodel near me or bathroom remodel in Cincinnati? Choose My Cincinnati Handyman, a leading partner for various handyman services in Cincinnati. They are experts in kitchen remodeling, bathroom remodeling, window replacement, drywall repair, and other maintenance services.